Project
Stable
Project overview
Construction of new stable black included ground and concrete work and the installation of storm water drainage. Additionally the stable block was equipped with complete electrical fittings.
Our skills
OJP Contracts solution
- Concrete works
- Storm water drainage
- Stable fit
- Electrics
Services
Relevant services
We provide a wide range of services from fabrication to installation
Contact us
Got a project?
Get in touch today!
Give us a call or fill out the form and a member of the team will be in touch as soon as possible!